The experiment of the "National Cooperative for the Disposal of Radioactive Waste" (NAGRA) was investigating the storage of radioactive waste under realistic conditions in the Mont Terri Rock Laboratory. The installation of radioactive waste was simulated, and the thermal, mechanical and hydraulic long-term behaviour of the bentonite backfill material and the Opalinus Clay as host rock investigated.
The demonstration experiment was used to test methods for the emplacement of waste containers. It was performed on a 1:1 scale, and the emplacement concept for spent nuclear fuel elements was checked. The waste heat generated by radioactive decay and the weight of the waste containers was simulated with heating elements. Over several years, the behaviour of the backfill materials and the host rock under the effects of temperature were observed.
Amberg was responsible for the study of variants of the sealing organ in the preliminary project and also planned additional measures such as injections.
Amberg also supported NAGRA in the tendering and implementation planning. It included the planning of the sealing element, the formwork, the sealing measures as well as the investigation of the temperature development during the concreting process. The planning of the construction process and the construction schedule also formed part of the tasks of Amberg.
Sources of information about the experiment and images: Website of the Nagra / Mont Terri Rock Laboratory
For more detailed information about this project:
Find out more about our services
For around 60 years, the renowned Swiss Amberg Group has been a leader in engineering and surveying services for railway, metro, underground and specialised civil engineering.
The family-owned company is an innovative knowledge, engineering and technology provider in the field of logistics and infrastructure for smart cities, hubs and networks. We provide outstanding solutions for our customers through innovatively combining above-ground and underground space utilisation.
Amberg Engineering
Engineering services for the construction of underground infrastructure
Planning, design, construction, operation and maintenance of railway, road, utility and metro tunnels, as well as caverns
Amberg Technologies
Systems and solutions for railway and tunnel surveying
Acquisition, evaluation and refinement of measurement data in infrastructure construction
Amberg Infra 7D
Digital services in the infrastructure environment
Geo-monitoring, mobile mapping, digital construction, geomatics and inspection services
Amberg Loglay
Smart city and construction logistics solutions
Sophisticated logistics solutions for efficient and future-orientated construction projects
Amberg Infocon
High-quality design and BIM services
Design, BIM, consulting, PMC and IT solutions for architecture, engineering and construction
VersuchsStollen Hagerbach
The underground future lab
Extensive underground research infrastructure for testing and development, testing laboratory for building materials, training centre and event facilities
QAECY
Intelligent information
Analysing documents and data with artificial intelligence to create a unified view of reality
Your underground experts
Engineering at its best
Infrastructure experts
Systems and solutions
Digital infrastructure experts
Solutions and services
Smart cities and construction logistics experts
Solutions for construction sites
Design and construction experts
Services
VersuchsStollen Hagerbach - The underground future lab
Recently named a research infrastructure of national importance, we have been providing the space and expertise to turn visions into innovations for over 50 years.
Your analysis and testing requirements
Our facilities and services
AI agent as a service for the construction industry
Solution and services