Amberg Engineering - Untertagbau - Spezialtiefbau - Tunnelbau - Ingenieurbau - Metro - Bahn - Strasse - Versorgungstunnel - Unterirdische Räume - Bauwerkserhaltung - Planung - Design - Statik - Projektmanagement - Geotechnik - BIM - Aerodynamik - Lüftung - Risiko Sicherheitsmanagement - Referenzen - Projekte - Gotthard Basistunnel - Brenner Basistunnel - Albula Tunnel - Metro Bukarest - Flughafen Montreal - Chip Fabrik - Versuchsstollen - Hochgeschwindigkeitszug - Versorgungseinrichtungen - Nuklearer Abfall - Amberg Engineering - Schweiz - Management Team - Marktverantwortliche - Nachhaltigkeit - Fachverbände - Karriere - Jobs - News - Events - Company Engineering - Underground construction - Specialist deep construction - Tunneling - Civil engineering - Metro - Railway - Road - Utility tunnel - Subterranean spaces - Structural maintenance - Planning - Design - Statics - Project management - Geotechnics - BIM - Aerodynamics - Ventilation - Risk & Safety Management - References - Projects - Gotthard Base Tunnel - Brenner Base Tunnel - Albula Tunnel - Bucharest Metro - Montreal Airport - Underground chip factory - Test gallery - High-speed train - Utility facilities - Nuclear waste - Amberg Engineering - Switzerland - Management Team - Market Managers - Sustainability - Associations - Careers - Jobs - News - Events
Mont Terri, Switzerland

Full Scale Emplacement Experiment Lucoex

 
 
2012
START OF THE PROJECT
3,5MPa
STRAIN ON THE SEALING MECHANISM
50m
SHAFT LENGTH
1Mio.
DATA POINTS / DAY

The experiment of the "National Cooperative for the Disposal of Radioactive Waste" (NAGRA) was investigating the storage of radioactive waste under realistic conditions in the Mont Terri Rock Laboratory. The installation of radioactive waste was simulated, and the thermal, mechanical and hydraulic long-term behaviour of the bentonite backfill material and the Opalinus Clay as host rock investigated.

The demonstration experiment was used to test methods for the emplacement of waste containers. It was performed on a 1:1 scale, and the emplacement concept for spent nuclear fuel elements was checked. The waste heat generated by radioactive decay and the weight of the waste containers was simulated with heating elements. Over several years, the behaviour of the backfill materials and the host rock under the effects of temperature were observed.

Amberg was responsible for the study of variants of the sealing organ in the preliminary project and also planned additional measures such as injections.

Amberg also supported NAGRA in the tendering and implementation planning. It included the planning of the sealing element, the formwork, the sealing measures as well as the investigation of the temperature development during the concreting process. The planning of the construction process and the construction schedule also formed part of the tasks of Amberg.

Sources of information about the experiment and images: Website of the Nagra / Mont Terri Rock Laboratory

For more detailed information about this project:

Contact us

Find out more about our services

Underground space

Picture Gallery

Amberg Engineering - Untertagbau - Spezialtiefbau - Tunnelbau - Ingenieurbau - Metro - Bahn - Strasse - Versorgungstunnel - Unterirdische Räume - Bauwerkserhaltung - Planung - Design - Statik - Projektmanagement - Geotechnik - BIM - Aerodynamik - Lüftung - Risiko Sicherheitsmanagement - Referenzen - Projekte - Gotthard Basistunnel - Brenner Basistunnel - Albula Tunnel - Metro Bukarest - Flughafen Montreal - Chip Fabrik - Versuchsstollen - Hochgeschwindigkeitszug - Versorgungseinrichtungen - Nuklearer Abfall - Amberg Engineering - Schweiz - Management Team - Marktverantwortliche - Nachhaltigkeit - Fachverbände - Karriere - Jobs - News - Events - Company Engineering - Underground construction - Specialist deep construction - Tunneling - Civil engineering - Metro - Railway - Road - Utility tunnel - Subterranean spaces - Structural maintenance - Planning - Design - Statics - Project management - Geotechnics - BIM - Aerodynamics - Ventilation - Risk & Safety Management - References - Projects - Gotthard Base Tunnel - Brenner Base Tunnel - Albula Tunnel - Bucharest Metro - Montreal Airport - Underground chip factory - Test gallery - High-speed train - Utility facilities - Nuclear waste - Amberg Engineering - Switzerland - Management Team - Market Managers - Sustainability - Associations - Careers - Jobs - News - Events
Excavation work in the shaft for the experiment.
Amberg Engineering - Untertagbau - Spezialtiefbau - Tunnelbau - Ingenieurbau - Metro - Bahn - Strasse - Versorgungstunnel - Unterirdische Räume - Bauwerkserhaltung - Planung - Design - Statik - Projektmanagement - Geotechnik - BIM - Aerodynamik - Lüftung - Risiko Sicherheitsmanagement - Referenzen - Projekte - Gotthard Basistunnel - Brenner Basistunnel - Albula Tunnel - Metro Bukarest - Flughafen Montreal - Chip Fabrik - Versuchsstollen - Hochgeschwindigkeitszug - Versorgungseinrichtungen - Nuklearer Abfall - Amberg Engineering - Schweiz - Management Team - Marktverantwortliche - Nachhaltigkeit - Fachverbände - Karriere - Jobs - News - Events - Company Engineering - Underground construction - Specialist deep construction - Tunneling - Civil engineering - Metro - Railway - Road - Utility tunnel - Subterranean spaces - Structural maintenance - Planning - Design - Statics - Project management - Geotechnics - BIM - Aerodynamics - Ventilation - Risk & Safety Management - References - Projects - Gotthard Base Tunnel - Brenner Base Tunnel - Albula Tunnel - Bucharest Metro - Montreal Airport - Underground chip factory - Test gallery - High-speed train - Utility facilities - Nuclear waste - Amberg Engineering - Switzerland - Management Team - Market Managers - Sustainability - Associations - Careers - Jobs - News - Events
The tunnel just before concreting the sealing mechanism.
Amberg Engineering - Untertagbau - Spezialtiefbau - Tunnelbau - Ingenieurbau - Metro - Bahn - Strasse - Versorgungstunnel - Unterirdische Räume - Bauwerkserhaltung - Planung - Design - Statik - Projektmanagement - Geotechnik - BIM - Aerodynamik - Lüftung - Risiko Sicherheitsmanagement - Referenzen - Projekte - Gotthard Basistunnel - Brenner Basistunnel - Albula Tunnel - Metro Bukarest - Flughafen Montreal - Chip Fabrik - Versuchsstollen - Hochgeschwindigkeitszug - Versorgungseinrichtungen - Nuklearer Abfall - Amberg Engineering - Schweiz - Management Team - Marktverantwortliche - Nachhaltigkeit - Fachverbände - Karriere - Jobs - News - Events - Company Engineering - Underground construction - Specialist deep construction - Tunneling - Civil engineering - Metro - Railway - Road - Utility tunnel - Subterranean spaces - Structural maintenance - Planning - Design - Statics - Project management - Geotechnics - BIM - Aerodynamics - Ventilation - Risk & Safety Management - References - Projects - Gotthard Base Tunnel - Brenner Base Tunnel - Albula Tunnel - Bucharest Metro - Montreal Airport - Underground chip factory - Test gallery - High-speed train - Utility facilities - Nuclear waste - Amberg Engineering - Switzerland - Management Team - Market Managers - Sustainability - Associations - Careers - Jobs - News - Events
Model of the closure organ from the variant study.