Katra, India

Katra Dharam Safety + Ventilation

 
 
2015
START OF THE PROJECT
2019
END OF THE PROJECT
7
TUNNELS
2Bn. USD
OVERALL COSTS

The railway track from Katra to Dharam is a 35-kilometre-long part of the railway line from Udhampur to Baramulla in northern India. There are seven tunnels on the section, which are longer than two kilometres. For this reason, they must be ventilated according to Indian regulations. Amberg has planned and implemented the safety and ventilation concept.

The new line connects the Kashmir Valley with the Indian railway network. It is the largest railway project since the country's independence. Dozens of tunnels had to be driven through the tectonically challenging young Himalayas.

The work of the Amberg Safety + Ventilation Team was also demanding. The aim was to develop an efficient and powerful ventilation system that would function correctly in the harsh environmental conditions and have no problems with pollution from diesel trains.

The safety fundamentals are based on the prevention of incidents and the reduction of the effects of such an incident. In addition, the aim was to achieve simple self-rescue of passengers. The infrastructure of the tunnels, the rolling stock and the organisation of the operator had a direct influence on the safety measures developed. These include preventive measures to avoid incidents, such as keeping trains and switches in perfect condition, communication by radio and limiting train access to the tunnels. Fire alarms via CCTV, fire detectors and jet fans along the entire length of the tunnels are used to mitigate damages. The fans are a simple and effective solution under all operating conditions.

In order to increase the chances of self-rescue, various escape tunnels with cross passages have been built and modern signage, lighting and emergency doors have been installed.

The outbreak of a fire in a tunnel has far-reaching consequences for people and material. The Amberg engineers have run through various scenarios to simulate the effects and development of fire. One of the possible scenarios is the fire of a train that comes to a standstill shortly before the tunnel. The jet fans are activated and ventilate towards the burning train in order to prevent the smoke from entering the tunnel and thus protect it.

Should a fire break out in a freight train that is still stopped inside the tunnel, the fire alarms react immediately. The jet fans are activated and ventilate towards the train before it comes to a standstill to protect the train driver.

Contact us to learn more about fire scenario simulations. Read more in the article in the magazine "Tramways & Urban Transit".

For more detailed information about this project:

Contact us

Find out more about our services:

Railways

Picture Gallery

Smoke concentration and visibility distribution in the tunnel without and with mechanical ventilation
Jet fan in the tunnels for longitudinal ventilation and optimum smoke management
The ventilation in the tunnel during construction
Amberg Group
100%
family-owned
7
companies
600+
employees

For around 60 years, the renowned Swiss Amberg Group has been a leader in engineering and surveying services for railway, metro, underground and specialised civil engineering. 

The family-owned company is an innovative knowledge, engineering and technology provider in the field of logistics and infrastructure for smart cities, hubs and networks. We provide outstanding solutions for our customers through innovatively combining above-ground and underground space utilisation.

go to website
Amberg Engineering

Your underground experts 

  • Rail tunnels, including high-speed rail
  • Metro lines
  • Tunnel and shaft infrastructure
  • Caverns with large cross-sections
  • Energy storage and utilities 

Engineering at its best 

  • Numerous services for your entire project cycle, from feasibility, planning and construction to renewal of your infrastructure
  • Trained specialists and experts in planning and design, geotechnics, and project management
go back
go to website
Amberg Technologies

Infrastructure experts 

  • Rail, metro and tunnels
  • Underground spaces
  • Mining and shafts 

Systems and solutions 

  • Slab track, tamping, mapping, surveying and inspections
  • Tunnel machine guidance
  • Tunnel profile measurements and stakeout
  • Undulation
  • Layer thickness control
  • Surface inspection
  • Geological predicting during tunnel excavation
  • Surveying, data analysis and maintenance
go back
go to website
Amberg Infra 7D

Digital infrastructure experts 

  • Data acquisition and processing
  • Monitoring
  • Measurement of geotechnical tasks
  • Maintenance and operation
  • Process optimisation and digital continuity 

Solutions and services 

  • Geo-monitoring
  • Mobile mapping
  • Geomatics
  • Inspection services
  • Digital construction
go back
go to website
Amberg Loglay

Smart cities and construction logistics experts

  • Manage stakeholders across the value chain
  • Improve construction mobility in dense cities
  • Unlock up to 50% of the true potential of assets
  • Integrate circular economy principles into construction
  • Use smart data throughout the supply chain 

Solutions for construction sites 

  • End-to-end digital logistics processes
  • Rapid prototyping and smart sensors (IoT)
  • Logistics concept and manual (3D/4D)
  • Integration of logistics data
  • Logistics insights management (LIM)
  • Construction logistics management (CLM)
  • Management of external hubs and consolidation
go back
go to website
Amberg Infocon

Design and construction experts 

  • Design and BIM integration
  • Coordination between different disciplines
  • Information workflow setup
  • Facility management and BIM integration
  • Visualisation 

Services 

  • BIM implementation and creation of models
  • Clash detection, coordination and clash resolution
  • Construction documentation and shop drawings
  • 4D simulation and 5D estimation
  • Underground utilities
  • Laser scan to as-built models
  • IT solutions – BIM integration with FM application
go back
go to website
VersuchsStollen Hagerbach

VersuchsStollen Hagerbach - The underground future lab 

Recently named a research infrastructure of national importance, we have been providing the space and expertise to turn visions into innovations for over 50 years. 

Your analysis and testing requirements 

  • Real scale test and prototype environment
  • Analysis of construction material
  • Training facility
  • Unique location for your event 

Our facilities and services 

  • Various test sites, test procedures and management
  • Concrete and rock laboratory
  • Training environment and syllabus
  • Seminar rooms, event cavern and restaurant
go back
go to website
QAECY

AI agent as a service for the construction industry 

  • AI agent dedicated to the AEC industry
  • Easy access to complex project information
  • Helps in taking confident, informed decisions
  • Opens data silos, unlocks all content and uncovers context
  • Effortless interaction with your most valuable asset – your collective knowledge 

Solution and services 

  • AI agent as a service
  • Strategic consulting and training
  • Development of tailored solutions
go back
go to website