Anything can be calculated today, the question is, whether the method is appropriate and what features need to be abstracted. Furthermore, a correct and technically profound interpretation of the calculated results is essential for a reliable design of complex underground structures. Based on 50 years of tunnelling and underground infrastructure experience, AMBERG defines the correct analysis method, relevant questions to be asked and integrates the entire process into the overall design process.
The custom – tailored analysis is performed with highest competence and efficiency, and the answers to the questions are prepared in an easy-to-understand, logical way. The special knowledge of AMBERG employees allows the seamless transfer from complex geometries from 3D BIM-Models into the numerical modelling software. This allows detailed and efficient geotechnical analysis and supports the design and goes hand in hand with the BIM Modelling.
Project
Semmering Base Tunnel, Austria
Services
Modelling and numerical investigation of the shaft head caverns in construction lot SBT1.1 and of the cavern expansion at shaft foot in lot 3.1: Design of rock support, verification of serviceability
Client
ÖBB INFRA
Project
Tunnelbana Stockholm, Sweden
Services
Modelling and numerical investigation of the complex underground construction circumstances with implementation of the complex fault zone structure: Design of rock support, sensitivity analysis regarding the fault zone influence, verification of serviceability, development of optimal construction sequence, numerical discontinuity analysis and permanent support validation, compilation of the relevant monitoring variables to be observed.
Client
WSP
Project
Brenner Base Tunnel – Construction lot H51, Austria
Services
Modelling and numerical investigation of the emergency station St. Jodok
Client
BBT SE